Birmingham New Street Area Re-Signalling Phase 6. Phase 6 of the above project requires the design and installation of 2 no. PSPs (Principal Supply Points). These provide a back up…
Read More
Midland Mainline Electrification ESL’s initial involvement on this project was in modest civil engineering design packages. Our success in delivering these packages on time and on budget was recognised as…
Read More
Norwich Victoria Sidings ESL acted as the specialist civil engineering subcontractor and carried out the design and build of the civil engineering works associated with the refurbishment of the sidings.…
Read More
Cornbrook Structure Assessments ESL carried out a series of surveys to the viaduct to determine the extent of the corrosion issues which had been identified and to fully dimension and…
Read More
Therapia Lane Depot Works The purpose of the power re-balancing project was to more evenly distribute the power supply between the two circuit breakers present at the depot. ESL’s scope…
Read More
Edinburgh Tram We were approached for these works because we have a reputation for delivering challenging bespoke designs. We were initially contracted to design the foundation for the mast, and…
Read More
North West Electrification Programme Phase 3 ESL developed the OLE design for the depot from close out of GRIP 3 to GRIP 5. Working closely with WSP, who were designers…
Read More