Derby Test Track

Bombardier Hospital Line Electrification ESL entered in to contract for Overhead Line design and build. Our in-house design team produced an outline design that interfaced with the track layout and…
Read More

Dollands Moor

Dollands Moor Transformer Renewals OLE Switching At Dollands Moor depot a series of isolating transformers are installed to segregate the CTRL AC OLE system from stray current from the NR…
Read More

Bombardier P-Line

OLE Foundation Installation By the time ESL mobilised to site the project had already encountered several delays in the design process meaning that completing the works has swiftly as possible…
Read More

Therapia Lane

Therapia Lane Depot Works The purpose of the power re-balancing project was to more evenly distribute the power supply between the two circuit breakers present at the depot. ESL’s scope…
Read More

Edinburgh Tram

Edinburgh Tram We were approached for these works because we have a reputation for delivering challenging bespoke designs. We were initially contracted to design the foundation for the mast, and…
Read More